Sunday, 2 August 2015

Roof!

Roof is on, bricks are on site! Bricklaying should start this week or next week :)














Tuesday, 28 July 2015

Fascia, gutters, doors and windows

A few photos of the fascia and gutters and some of the windows, doors and doorframes. Scaffolding for the roof has started so we should have a roof this week :)





 from the front

Bathroom window

Laundry door and bedroom window

Front door

The bath framing is my favourite!

Study at the front


Sunday, 19 July 2015

Roof trusses and walk-through

On Saturday work started on our roof trusses and with the workers on site, we were able to do a quick walk through and finally get a real sense of the space and the rooms. The slab seemed so small before framing started but it's really starting to resemble a house now!




Back of the house with 2 sliding doors and stacker door 

Kitchen and dining room

Pantry

Fridge space

Bedroom 2

Bathroom

Master bedroom (looking through hall closet)

Ensuite(left) and walk-in robe

Bedroom 3 

Home theatre

Fireplace framing and TV recess

Laundry

And I forgot to take a photo of the study/ bedroom 4 inside, but it's the front room







Thursday, 16 July 2015

More photos

My dad was in the neighbourhood today so went past our block. I mentioned any visits during the build had a mandatory requirement of photos so I'm glad he listened!

Our doors, windows and door frames were on site and looks like some more work had been done, probably yesterday. The weather was terrible today so everything was super wet! He ran into our site supervisor there too and word on the street is that our bricks MIGHT get done in two weeks now, and if so they will wait and do the roof after that. My dad mentioned not to get my hopes up though :p We shall see how it all plays out...

Fireplace

Sliding doors


Our big-ass stacker door (standing up)

Windows



Tuesday, 14 July 2015

Framing started

Got a call from our site supervisor this morning to advise that the frame carpenter was onsite and work has commenced. Framing should be completed by the end of the week and we should have a roof by the end of next week. Unfortunately there is a severe shortage of bricklayers, so there will be a 4-5 week delay with no activity after that. However, he is confident they will still finish before 18 December, quite possibly late November/early December.

 




 

Sunday, 12 July 2015

Ready for framing

Had a bit of an annoying end to the week dealing with an unreliable tradie who we had organised to remove our excess soil. Ryan our slab supervisor really helped us out and late on Friday afternoon we were able to lock in someone recommended by the builder to go out instead, first thing Saturday morning. 7am wake-up on a weekend was a shock to the system, but we were glad to get it all sorted. Framing will be on-site tomorrow (Monday) and we will move over to our site supervisor, Bernard. 


Excess soil removed



Kordon termite barrier completed