Sunday, 28 June 2015

Starting to feel real now!



Slab from the front

Slab from the side with patio

 our side yard which is approx 6m w at the front and 2m w at the back

Slab from the back

water tank space and 2m from boundary on this side

Back yard approx 4m. Not a lot but will be an alfresco/entertaining area 

Tuesday, 23 June 2015

Completion date and site supervisor

We got a letter in the mail today from McDonald Jones introducing us to our building supervisor Bernard, who will be taking over from Ryan from frame stage until completion.

The other promising and freaky bit of information was that in line with our building contract, our home needs to be completed by 18th December, excluding allowable extensions for wet weather etc.

The reason this is rather freaky (but hopefully a good sign) is that the 18th December has been the exact date in my head as the absolute last day for handover, that will give us a spare 4-5 days to get our flooring done before Christmas closure. On the weekend we went down to the display home again (for the hundredth time) and when we mentioned we had just started building, one of the ladies in the office said we'd easily be in by Christmas. I'm not going to get my hopes up but there are lots of little signs that are making me feel that it won't be impossible!

Monday, 22 June 2015

Piering

Piering commenced today and we came in at 43 lineal metres, under the allocation of 50 in our contract. Good to know we will get a small refund and didn’t need to pay any extra. My husband went down to do the piering inspection at 12pm and was told that plumbers will be onsite tomorrow, and formwork is scheduled for Wednesday and Thursday if the weather is okay. If everything goes to plan, our slab could be poured on Friday. I will be going outside to do a sun dance I think as the weather is looking sketchy on Wednesday and Thursday. Otherwise, we should have a slab next week.



Saturday, 20 June 2015

Site preparation

Site preparation is complete and piering is scheduled for Monday, pending the weather.



Sunday, 14 June 2015

Lights

The thought of committing to pendant lights has been haunting me for a good period of time now. We have been looking on and off for ages and today we made some decisions and purchases. Another thing to tick off the list! We also bought a wall-mounted clothesline (very exciting I know).

We already have downlights in the kitchen, living area and theatre but wanted to do pendants in the hall/entry and also some additional pendants to hang over the kitchen Island.

Below is the kitchen in the display home.


We have chosen 3 satin chrome tear drop pendants 

     

Below are the antique silver pendants for the entry and to run down the hall.



Wednesday, 3 June 2015

Let the construction begin!

We are officially on the construction list!!! Can't wait to see some progress.