Wednesday, 9 July 2014

Preliminary Plans

We received our preliminary plans last week and have our appointment tomorrow. Good to see where everything is sitting including taps, the gas hot water system, meterbox and watertank. We will be adding an additional tap to the left side of the house as we have a side yard here.

Changes we made in our tender were:
  • Addition of external garage door
  • Removal of double linen in hall (cutting into walk-in robe on opposite side) and addition of double and singlet linen in hall furniture recess
  • Shampoo recess in bathroom and ensuite












Sunday, 15 June 2014

Thanks Harvey!

We went on a bit of a shopping spree today and took advantage of Harvey Norman's mid-year sale. Got 20% off and 50 months interest free on these pieces:

Chairs (as is in almond fabric) 






















Table























Buffet















Lamp table























Coffee table 















My clever husband cut out the furniture to scale so we could play around with it on our floorplan. The dining table and buffet will go in the dining area, and the lamp table will be down the end between two armchairs in the living area. The coffee table is for the home theatre. We decided when we chose the house, that we didn't want two living areas/sets of couches so will have a nice big dining/entertainment area and a little sitting area against the side wall. Will be a nice area to curl up with a book.

Playing with the floorplan - still a few different places we could put things, but definitely plenty of space



















This range is made from solid silver top ash timber in smoke colour (displayed). It has a lovely distressed look and stainless steel accents. 

Can't wait to see them in our house!

Monday, 9 June 2014

Colours, argh!


Been a busy week this week. We have gone from deposit variation to interim consolidated tender. We now have our pre-colour appointment booked in for the end of the month and our main colour appointment in early August. 

Once again I have been overly impressed with the service from McDonald Jones. Everything has happened so quickly and smoothly. Within a few hours of receiving an email advising that we will be appointed a client liaison officer who will be in touch shortly, I received a call from Melissa introducing herself. I'm sure I will be bugging her lots over the next year (or more, poor girl!) 

I have also started mentally preparing myself for all the decisions we will need to make over the next few months *deep breaths*. It's going to be super fun but there is also so much pressure to get it all right! 

We have been looking through the included Austral brick ranges online and really liked the look of the Urban One Pepper - but it is so hard to tell how they really look. So much variation online, even when looking at photos of housing being built with these bricks. We have been meaning to go out to the display centre, and finally got around to it today to see them in the flesh. I was attracted to them before I even knew they were the ones. Below are a few snaps (very cloudy and rainy today so only managed to get a few in direct sunlight). 

I have to say I LOVE them and so does the husband, so that's one decision made, a million to go. I was worried they were going to be too dark but they were lighter than expected and I love the colour variation through them. We were also given a list of houses to look at around Sydney that had used these bricks, and I fell even more in love with them seeing them used for a completed house. 

 Super excited to now have a sample brick! Not exactly sure where to put it though haha.






And a sneaky one of a beautiful house in Pepper!



Update on our land as well. Our road has been dug out and blocks are pegged, Woo!



Pretty rainbow at Willowdale today (our block is somewhere in front of the mound of dirt)


Sunday, 25 May 2014

So the journey begins

Big day today - we paid our deposit to go ahead with our builder!


We will be contacted in the next few weeks to arrange our initial walk-through in the colour studio (can't wait!). This is a 1.5 hour appointment to get all our folders of upgrades/pricing etc. and understand the process. Colour selection apparently takes at least 5 hours, so lucky we can get started on some decision-making and go in as organised as possible! They gave us a nice big box to keep all our files and folders in:


We also went past our estate today. It has been 4-5 weeks since we were there last when we purchased our block and wow they have done a lot! Last time our release area was still covered in trees and sheep. The estate was gated as it was a construction zone, though we and I know a few others took some sneaky drives in when the gates were open for workers, when all the roads were in. Since then the whole front area of the estate is open and pretty much finished. I know some of the first releases are now registered so some houses should be starting soon. We were able to drive right up to where the new construction gate is and were lucky enough to locate and stand on our street! 

The start of our street leading into the construction zone. Our land is at the other end


Looking towards the construction zone where the street will continue


Over that-a way! Me with our blank street sign (that I labelled for unnamed road 015)


Tuesday, 13 May 2014

More quotes, contracts, deposits, oh my!

So we met with Sekisui House on Sunday morning. The Mitsu was actually the first display home we liked. Though we had been in the McDonald Jones display homes and loved them. But those houses at Homeworld Kellyville were a bit too big for our needs. I had bookmarked the Infinity online but wasn't sure if or when we would get there because the display home was at Oran Park. This was at the point when I had in my head that Oran Park was really far away. It's only 10 minutes from where we had been looking at land! Whoops!


When we were looking at houses, we had one big thing we weren’t going to settle on and that was having the master bedroom at the front of the house. I think I hated this much more than my husband, but we found that almost all of the display homes were like that! I didn't want my bedroom next to the front door so this made the search a little more tricky.

The Mitsu has a lot of glass, with a really nice side alfresco/entertaining area. The kitchen is my dream kitchen. I have to say it is probably my favourite out of any I have seen in a single storey display home. 


I couldn’t resist putting in a picture of this kitchen. Benches as far as the eye could see! (though it had been extended a bit for the display home).





















This was my general list of pros and cons when comparing the Mitsu with the Infinity:

Mitsu


Pros
  • Kitchen!!! *drool* long benches, heaps of storage and a butler's pantry
  • Side entertaining area would work well on our land
  • Storage- the cloakroom is a little bit awesome
Cons
  • Layout is a bit more disjointed
  • Kitchen is more like a hallway in the house
  • All the bedrooms, including the master are all next to each other (yes I'm fussy)
  • Master bedroom is smaller than infinity
  • We weren't as happy with the consultation process which was a big negative as we were super impressed with the McDonald Jones initial consult
Infinity


Pros
  • Massive master bedroom and built in robe (what more could I want?)
  • Master bedroom separate to other bedrooms 
  • Love, love love the home theatre. This is my favourite thing about this house. The living spaces are just gorgeous (see below with the see-through shelf into the living area, which is standard and a really nice design feature) 
  • The staff have been amazing and the consultation process covered everything we needed
Cons
  • I love the kitchen but I have to say the Mitsu kitchen is still favourite
  • Our whole backyard will pretty much be alfresco (when we do it after handover). But we will have a side yard

















After not much deliberation, when we got out of our appointment with Sekisui we just knew we wanted to build with McDonald Jones. The Infinity had always been the favourite, but the cost had made us have some second thoughts. Happy to say we will be going ahead and paying our deposit in a few weeks!

Update on our land contract - all signed yesterday and final last deposit paid. Won't have to do much else with this until registration in January - March 2015.

Now the fun begins! I really need to get Pinterest to start collecting ideas for the house. We have started to explore the included Austral brick ranges and also Colorbond roof colours. We have a  colour palette to follow for the roof which is in our estate design guidelines, but there are a few we like anyway. 


These were the promos that were 'thrown in' with our finalised McDonald Jones quote:
  • $5000 Impressions upgrade package for freesies 
  • Upgrade from Omega oven/stove/rangehood to Smeg and dishwasher and microwave included
  • $4000 off ducted air-con. Still deciding on this. It's a brand we haven't heard of and reviews haven't been great. We could get a better system for the same price after handover I think. 
More photos:

 Living/dining



















Bedroom


















Bathroom





















Kitchen 1


















Kitchen 2




















Master bedroom

Tuesday, 6 May 2014

First Quote

On Sunday we had our first meeting with our potential builder – McDonald Jones Homes to start the quoting process for the Infinity One!
I have to say that first impressions with this builder have been great. I have been liaising with a few of the sales staff and consultants and they have been able to answer all my queries and provide the necessary information. Tracey our consultant at Oran Park has been really helpful and knowledgeable. 
This is what we have put down for our quote (pretty sure I haven't forgotten anything!): 
  • 2.55m high ceilings
  • Removed the outside door in the bedroom and replaced with a big window
  • Removed double linen in hall to allow for more space in the walk-in robe
  • Added 2 x double linen cupboards in place of hall furniture recess
  • Extension of bedroom 3 wardrobe
  • Bedroom 2 and bedroom 3 wardrobes with one door mirrored 
  • 40mm stone to kitchen benches and island
  • Shampoo recess to bathroom and ensuite
  • Ducted air-conditioning 
  • Chase B Facade
  • Impressions upgrade package which includes quite a bit, but to name a few: steel frame, 900 wide oven and cooktop, glass canopy rangehood, automatic garage door opener, square washbowls and 20mm stone benches for the bathroom and ensuite 



This is the chase facade (though on a different house- our front door runs down the side):

























Flooring (except wet areas) are after handover- we would love to do bamboo throughout the house but carpet for the bedrooms and home theatre. We will also look at doing downlights after handout. 
I received a text message from Tracey yesterday to advise that a site inspection of our land has been booked. I think this will be for the soil sample for the slab, as we have already provided the contour map. We have been quoted worst case for site costs and from what I have read about the area and the high salinity, I don't think this is going to come down.  
Costs have been more than we expected and the scary thing is that a lot of the other things we enquired about are done at the colour consult and electrical consult. No idea how much we budget for that! 
We have another appointment Saturday afternoon to get the quote - though it will just be the husband going to this. I have told him he needs to write down EVERYTHING! I don't like missing out on things haha.
We are going to get a quote from Sekisui on Sunday morning as well for comparison. The Mitsu is our second preference.

Friday, 2 May 2014

Contract time

so just a bit of light reading to do...


The contract is MASSIVE! Even our conveyancer was shocked. He warned me, but I didn't expect close to 600 pages. He has started the review process and scanned and emailed us a copy to read through. I was feeling really overwhelmed by the size, but now that I have had a few flicks through it, it actually isn't too bad at all. Big chunks of it apply to a number of other lots as well so I enjoyed skipping these sections! We have an electrical substation on the lot next door which affects a few metres of our land (but luckily we have really wide frontage for the house we are building so shouldn't affect the build). The requirements are to do with fire-resistant walls but as we aren't likely to be building in this restriction zone I really don't think it will be necessary. The area is deemed to be bushfire prone, but the rating for our particular lot is low so it will be interesting to see what the implications of this are.

We spoke to someone at McDonald Jones briefly last weekend at Oran Park (where our display home is) and have an appointment for Sunday morning. They have told us they can give us a quote without having to visit the land (which isn't anywhere near ready). It will be good to get a better idea of all the costs ahead. They can also lock in a price for 12 months; 5 months free and a fee to extend. This is on payment of a $3000 deposit.

Fingers crossed our budgeting is fairly accurate, though I know there will always be unexpected costs!